- A Growing Problem
- "You continue to add more and more servers every year. Your Data
- Center is getting crowded and really needs more room.
- Your New Data Center
- "You are probably thinking about a redesign of your existing computer room,
- or the potential expansion of your data center. You may be considering the
- buildout of a completely new data center. Many questions are coming up
- in discussions regarding these scenarios.
- Questions like:
- 1. How much room will we need?
- 2. How will we cool this equipment?
- 3. What about emergency power?
- 4. Where do we build this room?
- 5. How large a budget do we need?
- And more questions like:
- 1. Who will design the the room layout?
- 2. Who will size the equipment?
- 3. Who can supply the equipment?
- 4. Who can install the equipment?
- 5. Who will supervise the construction?
- Computer Room Design Corporation
- (logo)
- We will take care of all aspects of your new data center,
- from initial design to critical equipment startup.
- "What components will we utilize to fulfill your data
- center requirements?
- Let's look at some solutions
- Rackmount Enclosures
- Rackmount Enclosures provide easy organization of servers,
- UPS systems and switches. Rackmount Enclosures allow for
- the highest concentration of equipment in the smallest footprint. Voice/data cabling and
- maintenance are also simplified with rackmount enclosures.
- (please move this next page, which you call wiring tray systems, to be the LAST page in this section)
- Cable Tray Systems
- "A well designed cable management system should be installed as part
- of the initial data center buildout. Pulling cabling in a growing data center
- is greatly simplified with a precisely engineered and easily adaptable
- cable tray system. Let the experts at Computer Room Design assess your
- initial needs while calculating future requirements to make expansion easy.
- (please move this air conditioning page to be next)
- "Precision cooling systems from Computer Room Design Corporation can
- provide precise and reliable control of room temperature, humidity, and airflow
- for proper operation of computers and electronic equipment. Perimeter cooling units
- offer high energy efficiency, easy to use controls, and provide easy access for service.
- (this is the other air conditioning page, to be next)
- "Computer room air conditioning is a necessity in your data center, but space is usually
- at a premium. Space-saving alternatives like rack mounting, stacking several
- units, or CRAC suspension above a false ceiling can alleviate this problem.
- Computer Room Design Corporation can provide all of these alternatives in
- cooling, including spot-cooling and portable units.
- Uninterruptible Power Supplies (UPS Systems)
- Rackmount power protection from 12 KW to 60 KW designed to protect
- today's high powered servers and high density computing environments. These
- UPS systems provide a scalable, modular, and robust solution without
- generating the additional heat associated with legacy UPS products. Call
- us for your customized power protection solution.
- (please create a second UPS page, use photo of Eaton 9355)
- Uninterruptible Power Supplies (UPS Systems)
- For larger applications, three phase UPS systems offer the right combination of
- performance and price for your needs. CRD will show you numerous three
- phase UPS designs. We can select the appropriate UPS technology and battery
- pack for your application.
- Fire Suppression Systems
- CRD can protect your data center with a complete fire suppression system.
- Fire suppression systems detect fire or smoke and release a chemical
- agent that extinguishes the fire. The newer agents are FM200 and FE25.
- These replace the older Halon 1301 or CO2 systems. The new agents are
- safe to breathe for humans, even at 12 times the normal level of concentration.
- (please create new page with photo of raised floor, I sent you several previously)
- Raised Access Floors
- "A raised access floor provides a safe plenum for electrical cabling and voice/data/fiber
- cabling. Raised floors also channel cold air directly to server inlets for efficient cooling.
- CRD will supply and install a new or refurbished raised floor for your new data center.
- (please create new page with attached gen set photo)
- "For unlimited emergency power, a standby generator set is the ultimate solution.
- CRD will size the appropriate generator set for your existing power requirements
- as well as future needs. We will help you decide the best location, fuel source and voltage for your data center requirements.
- (please create new page with Tracetek TT1000 photo)
- "A small leak can damage a business in a big way. CRD's water detection
- systems not only sense the leaks, but also locate them; saving valuable time
- to repair the cause of the intrusion. Our distributed systems will detect a teaspoon
- of water, yet are unaffected by contaminants and corrosion in your raised floor
- plenum.
- Data Center Planning--self destruct--no changes
- Data Center Planning--please add photo section showing floor layout from E401 pdf
- "Professional planning will provide a blueprint of your new Data Center and will clearly define
- all of the components and their installation.
- THe Plan
- 1. Determine your requirements
- 2. Assess the site
- 3. Specify the right equipment
- 4. Create planning tools (layout, submittals, schedules of work)
- 5. Buildout of the Data Center
- Determine Your Requirements
- "You know what your business does, and how it is growing. We can help you with
- a tested and proven methodology that accurately determines your critical power,
- cooling, and physical space requirements. We gather this information via
- conversation, e-mail, or in some cases, a site visit to your location.
- "Understanding the physical space that will be transformed into your new
- Data Center, or remodeled Data Center, is key to the success of any turnkey
- project. Existing architectural drawings of the site will help, but for complicated
- appications, our subcontractors may need to visit the site so their professional
- views can help create an accurate plan.
- (this is a new screen for "Assess the Site")
- "CRD looks not only at the physical boundaries of the proposed data center
- space, but also how the surrounding rooms and outside walls may effect the performance of our equipment. We will determine the best way to bring the required power to the data center. We will determine how best to remove hot exhaust air from the data center. We also will show you how to keep the cold air and fire suppression agent within your critical data
- center space.
- SPECIFY THE EQUIPMENT
- "With your specific requirements and the spacial limitations in mind, the
- equipment can now be selected to build your data center. Our experience in creating
- all types and sizes of data centers is the key to the success of your project.
- An ongoing dialogue with you will continue as questions arise.
- Create Planning Tools
- "Now is the time to create accurate drawings that will clearly illustrate our
- design to the contractors who will install the equipment. Demo and floor plans,
- electrical and mechanical drawings, specifications and one-line drawings are
- all created electronically so that our design can be properly implemented.
- Buildout of the Data Center
- "Data Center construction can now begin. Equipment will be ordered,
- subcontractors will be selected, and schedules of work will be posted.
- Buildout of the Data Center
- "Computer Room Design Corporation will handle all aspects of the
- turnkey Data Center project, including drywall construction, rigging
- of heavy equipment and electrical/mechanical labor.
- CRD will hire all contractors and subcontractors. We will provide
- specific lists of contractor tasks to be performed. A CRD site supervisor
- will oversee all phases of the turnkey project. You will be kept continually
- up to date on project staus via telephone and email.
- Buildout of the Data Center
- "Contractors are seen here installing the raised floor, which provides
- for efficient cooling of equipment; and protects operators from high
- voltage and delicate fiber optic cabling.
- Buildout of the Data Center
- "Once the raised flooring is completed, other critical power and
- cooling components can be rigged to the site for installation.
- Buildout of the Data Center
- "Underfloor water detection, electrical distribution and voice/data
- cabling are installed.
- Buildout of the Data Center
- "The results look great, are easy to maintain, and provide convenient
- electrical receptacles for rackmounted servers.
- (let's not use that photo of the CoolCube above the ceiling; please use one of those
- photos I sent you that shows a crane lifting condenser on to a roof)
- Buildout of the Data Center
- "Air conditioning condensers are typically rigged via a crane on to your roof.
- Buildout of the Data Center
- (delete everything is coming together...)
- "All critical power and cooling equipment undergoes a rigorous "factory
- startup" inspection by a local factory trained service engineer. Computer
- Room Design Corporation turnkey projects are completed on-time and within budget.
- (first screen Your New Data Center) (add photo of monitor screen from PowerVision brochure page 5)
- Monitoring Your New Data Center
- (left side wording:)
- "All critical equipment in the completed data center can be remotely monitored
- via the internet. Alarms, status, temperature and power usage can all be quickly viewed from either the next room or from thousands of miles away.
- Expanding Your New Data Center (use picture you have there of Mercy)
- "Future expansion of your data center will be easy, now that a well-organized
- server area has been created. Additional rack enclosures for new servers
- can be easily added.
- (this is an existing screen)
- Operator Areas in Your New Data Center
- "The completed Data Center can feature a safe, secure and easy to use Command
- Console for your personnel.
- (new screen)
- Preventive Maintenance in Your New Data Center
- (use photo at bottom of CRD 2009 Overview of guy above photo called "Emergency Repair..."
- "CRD will coordinate complete service contracts for 24 hour hotline support, on-site emergency repair, and scheduled preventive maintenance of equipment.
- (change "About Us")
- The Leader in Data Center Design & Construction
- Computer Room Design Corporation has been building turnkey computer rooms, data centers, and server rooms since 1984. We have successfully completed hundreds of turnkey projects in over 40 states. CRD specializes in small and medium sized data center design
- and construction. We also complete smaller turnkey projects, like CRAC or UPS upgrades.
- We maintain strong relationships with established contractors in most areas of the country.
- We represent numerous major OEMs of critical power, cooling, life safety, raised
- access flooring and computer furniture & enclosures. Our philosophy is to prescibe the best solution for your needs and budget. We don't try to "shoehorn" our clients into a specific technology or product.
|